{"id":2688,"date":"2026-04-11T14:53:12","date_gmt":"2026-04-11T12:53:12","guid":{"rendered":"https:\/\/solarplusgarden.com\/?p=2688"},"modified":"2026-09-01T12:43:57","modified_gmt":"2026-09-01T10:43:57","slug":"fardplan-for-projektfasen","status":"publish","type":"post","link":"https:\/\/solarplusgarden.com\/sv\/project-phase-roadmap\/","title":{"rendered":"Projektfasens f\u00e4rdplan"},"content":{"rendered":"<style>.spg-clanak table{width:100%;border-collapse:collapse;margin:1.6em 0;font-size:.95em}.spg-clanak th,.spg-clanak td{border:1px solid rgba(0,0,0,.14);padding:.6em .8em;text-align:left;vertical-align:top}.spg-clanak th{background:rgba(36,154,98,.08);font-weight:600}.spg-clanak hr{margin:2.4em 0 1.2em;border:0;border-top:1px solid rgba(0,0,0,.12)}.spg-clanak hr + p em{font-size:.88em;color:#5a655e;display:block;line-height:1.6}<\/style>\n<div class=\"spg-clanak\">\n<p>Solar Plus Garden skaffar kapital i faser. Ibland tolkas det som tvekan \u2013 ett projekt som testar vattnet innan man best\u00e4mmer sig. Det \u00e4r tv\u00e4rtom. Fasindelningen \u00e4r f\u00f6reskriven i europeisk lag, och att f\u00f6rst\u00e5 varf\u00f6r f\u00f6rklarar det mesta av det som f\u00f6ljer.<\/p>\n<h2>Varf\u00f6r projektet \u00f6verhuvudtaget \u00e4r etappvis<\/h2>\n<p>Under <a href=\"\/sv\/investera-via-seedblink\/\"><strong>ECSPR<\/strong><\/a> \u2014 den europeiska f\u00f6rordningen om leverant\u00f6rer av gr\u00e4srotsfinansieringstj\u00e4nster \u2014 en enskild projekt\u00e4gare f\u00e5r samla in h\u00f6gst <strong>5 miljoner euro fr\u00e5n allm\u00e4nheten under ett kalender\u00e5r<\/strong>. Det \u00e4r ett h\u00e5rt regleringstak, inte ett m\u00e5l och inte en preferens.<\/p>\n<p>En fullst\u00e4ndig utbyggnad av en 10 MW-anl\u00e4ggning kr\u00e4ver <strong>7,2 miljoner euro<\/strong>. Det \u00e4r mer \u00e4n 5 miljoner euro. S\u00e5 h\u00f6jningen kan inte ske p\u00e5 en g\u00e5ng, och den \u00e4r strukturerad \u00f6ver faser och kalender\u00e5r f\u00f6r att h\u00e5lla sig inom regeln.<\/p>\n<p>Allt nedan f\u00f6ljer av den enda begr\u00e4nsningen.<\/p>\n<h2>Fas 1 \u2014 Upp till 2,2 miljoner euro<\/h2>\n<p>M\u00e5len f\u00f6r den f\u00f6rsta fasen <strong>upp till 2,2 miljoner euro<\/strong> och etablerar projektet: s\u00e4krar platsen, den byggklara positionen och det initiala byggkapitalet.<\/p>\n<ul>\n<li><strong>Tillg\u00e4ngligt format:<\/strong> eget kapital \u2014 den flexibla, l\u00e5ngsiktiga int\u00e4ktsandelen. Inget tak.<\/li>\n<li><strong>Inte tillg\u00e4ngligt \u00e4nnu:<\/strong> det konservativa l\u00e5net. Projektet kan inte acceptera skulddeltagande i fas 1 \u2014 det \u00f6ppnar i fas 2, n\u00e4r det finns en byggd eller f\u00e4rdig att bygga tillg\u00e5ng som s\u00e4kerheten kan knyta till.<\/li>\n<li><strong>Men du kan anm\u00e4la intresse f\u00f6r det redan nu.<\/strong> Att registrera sig kostar ingenting och det \u00e4r s\u00e5 du f\u00e5r besked n\u00e4r fas 2 \u00f6ppnar. Eftersom l\u00e5nedelen \u00e4r begr\u00e4nsad \u00e4r det meddelandet skillnaden mellan att delta och att l\u00e4sa att det fyllde.<\/li>\n<li><strong>Minsta deltagande:<\/strong> \u20ac500.<\/li>\n<\/ul>\n<p>Om du vill ha l\u00e5n med fast r\u00e4nta snarare \u00e4n eget kapital \u00e4r fas 1 inte din startpunkt \u2013 men det \u00e4r d\u00e5 du borde st\u00e5 p\u00e5 v\u00e4ntelistan, eftersom det \u00e4r s\u00e5 du l\u00e4r dig i samma \u00f6gonblick som fas 2 \u00f6ppnar.<\/p>\n<h2>Fas 2 \u2014 Upp till 7,2 miljoner euro totalt<\/h2>\n<p>Fas 2 inneb\u00e4r h\u00f6jningen till <strong>full utbyggnad p\u00e5 7,2 miljoner euro<\/strong> \u2014 ungef\u00e4r 5 miljoner euro ut\u00f6ver fas 1, f\u00f6rdelat f\u00f6r att respektera det \u00e5rliga taket.<\/p>\n<ul>\n<li><strong>Det konservativa l\u00e5net \u00f6ppnas h\u00e4r<\/strong> \u2014 fast 10% \u00e5rligen i tio \u00e5r, kapitalbeloppet \u00e5terbetalas via en avbetalningsfond. F\u00f6r det mesta av det hittills registrerade intresset \u00e4r detta det format som folk har v\u00e4ntat p\u00e5.<\/li>\n<li><strong>L\u00e5nebeloppet \u00e4r begr\u00e4nsat.<\/strong> Det finns en gr\u00e4ns f\u00f6r hur mycket skuld projektet kan ta p\u00e5 sig, s\u00e5 detta format \u00e4r endast tillg\u00e4ngligt upp till det taket. Eget kapital \u00e4r inte begr\u00e4nsat p\u00e5 samma s\u00e4tt.<\/li>\n<\/ul>\n<p>Uppdelningen mellan de tv\u00e5 formaten i det hittills registrerade intresset \u00e4r talande: av ungef\u00e4r <strong>1,1 miljoner euro<\/strong> av icke-bindande intresse uttryckt sedan den 28 augusti 2026, cirka <strong>\u20ac900,000 is for the conservative loan<\/strong> och <strong>200 000 euro f\u00f6r flexibelt eget kapital<\/strong>. De flesta som anl\u00e4nder till det h\u00e4r projektet vill ha det definierade resultatet.<\/p>\n<p>Det \u00e4r uttryckt intresse \u2013 inte mottagna medel och inte \u00e5taganden att investera.<\/p>\n<h2>Fas 3 \u2014 Batterilagring (BESS)<\/h2>\n<p>Fas 3 l\u00e4gger till en <strong>batterienergilagringssystem<\/strong>, och det \u00e4r fasen med minst avklarade detaljer. Det \u00e4r v\u00e4rt att s\u00e4ga det tydligt snarare \u00e4n att kl\u00e4 upp sig.<\/p>\n<p>Vad ett batteri g\u00f6r f\u00f6r det h\u00e4r projektet \u00e4r enkelt. En solcellsanl\u00e4ggning producerar n\u00e4r solen \u00e4r uppe, vilket ofta \u00e4r n\u00e4r regionala elpriser \u00e4r som l\u00e4gst, eftersom alla andra solcellsanl\u00e4ggningar producerar samtidigt. Lagring frikopplar de tv\u00e5: generera mitt p\u00e5 dagen, s\u00e4lj under kv\u00e4llstoppen. Samma kilowattimme ger mer el.<\/p>\n<p>Det \u00e4r d\u00e4rf\u00f6r investeringskalkylatorn visar BESS som en multiplikator p\u00e5 avkastning snarare \u00e4n en separat radpost.<\/p>\n<p><strong>Hur det ska finansieras \u00e4r \u00e4nnu inte fastst\u00e4llt.<\/strong> Planen har varit bankfinansiering \u2013 skulder p\u00e5 f\u00f6retagsniv\u00e5, vilket l\u00e4mnar investerarpositioner or\u00f6rda. Men beroende p\u00e5 investerarnas intresse kan det forts\u00e4tta utan bankinblandning. Vilken v\u00e4g som v\u00e4ljs kommer att bekr\u00e4ftas n\u00e4r fas 3 \u00e4r definierad.<\/p>\n<p>Det finns inga siffror f\u00f6r fas 3 \u00e4nnu. Den som ger dig ett BESS-returnummer idag extrapolerar.<\/p>\n<h2>Den operativa tidslinjen<\/h2>\n<p>Den finansiella modellen g\u00e5r fr\u00e5n <strong>2027 till 2051<\/strong> \u2014 en tjugofem\u00e5rig driftshorisont fr\u00e5n f\u00f6rsta generationen.<\/p>\n<ul>\n<li><strong>2027<\/strong> \u2014 generationen b\u00f6rjar. R\u00e4ntebetalningar f\u00f6r l\u00e5net b\u00f6rjar \u00e5r 1 f\u00f6r l\u00e5nedeltagare.<\/li>\n<li><strong>2037<\/strong> \u2014 slutet av \u00e5r 10. L\u00e5nekapitalet \u00e5terbetalas i sin helhet fr\u00e5n den \u00e5terst\u00e5ende fonden; l\u00e5netranchen avslutas.<\/li>\n<li><strong>Fr\u00e5n ungef\u00e4r \u00e5rskurs 12<\/strong> \u2014 int\u00e4kter som tidigare betalat l\u00e5net blir tillg\u00e4ngliga f\u00f6r aktie\u00e4garna. Aktieutdelningen \u00f6kar snarare \u00e4n att forts\u00e4tta vara of\u00f6r\u00e4ndrad. Det \u00e4r d\u00e4rf\u00f6r aktiekapitalfallet \u00e4r ett l\u00e5ngsiktigt fall.<\/li>\n<li><strong>2051<\/strong> \u2014 slutet av den modellerade perioden.<\/li>\n<\/ul>\n<h2>Var projektet st\u00e5r idag<\/h2>\n<table>\n<thead>\n<tr>\n<th><\/th>\n<th>Status<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Fas 1-m\u00e5l<\/td>\n<td>Upp till 2,2 miljoner euro<\/td>\n<\/tr>\n<tr>\n<td>Fullst\u00e4ndig utbyggnad<\/td>\n<td>7,2 miljoner euro<\/td>\n<\/tr>\n<tr>\n<td>Delm\u00e5l senast den 1 januari 2027<\/td>\n<td>5 miljoner euro \u2013 vilket ocks\u00e5 \u00e4r ECSPR:s \u00e5rliga tak<\/td>\n<\/tr>\n<tr>\n<td>Intresse uttryckt sedan 28 aug 2026<\/td>\n<td>~1,1 miljoner euro (ej bindande)<\/td>\n<\/tr>\n<tr>\n<td>Varav konservativa l\u00e5n<\/td>\n<td>~\u20ac900,000<\/td>\n<\/tr>\n<tr>\n<td>Varav flexibelt eget kapital<\/td>\n<td>~\u20ac200,000<\/td>\n<\/tr>\n<tr>\n<td>Kapacitet<\/td>\n<td>10 MW, s\u00f6dra Vojvodina, Serbien<\/td>\n<\/tr>\n<tr>\n<td>Fas 3 (BESS)<\/td>\n<td>Planerad; finansieringsv\u00e4g och siffror \u00e4nnu inte fastst\u00e4llda<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2>Vad detta betyder f\u00f6r din timing<\/h2>\n<p>Om du vill <strong>r\u00e4ttvisa<\/strong>, den \u00e4r \u00f6ppen fr\u00e5n fas 1 och forts\u00e4tter in i fas 2.<\/p>\n<p>Om du vill ha <strong>l\u00e5n med fast r\u00e4nta<\/strong>, du v\u00e4ntar p\u00e5 fas 2 \u2013 och v\u00e4ntar i k\u00f6 f\u00f6r en begr\u00e4nsad tilldelning. Omkring 900 000 euro i registrerat intresse har redan pekats mot detta format. Det \u00e4r den enda punkten i projektet d\u00e4r tidpunkten verkligen avg\u00f6r om du kommer in.<\/p>\n<p>I b\u00e5da fallen \u00e4r det v\u00e4ntelistan som f\u00f6rvandlar en fas\u00f6ppning till n\u00e5got du kan agera p\u00e5 snarare \u00e4n att l\u00e4sa om efter\u00e5t. Det kostar ingenting, f\u00f6rbinder dig till ingenting och det \u00e4r s\u00e5 den fullst\u00e4ndiga finansiella modellen och fasdokumentationen n\u00e5r dig innan en runda \u00f6ppnar.<\/p>\n<p style=\"text-align: center; margin: 2em 0;\"><a href=\"\/sv\/ga-med-nu\/\">G\u00e5 med i v\u00e4ntelistan f\u00f6r investerare \u2192<\/a><\/p>\n<h2>Vanliga fr\u00e5gor<\/h2>\n<h3>Varf\u00f6r inte bara samla in 7,2 miljoner euro p\u00e5 en g\u00e5ng?<\/h3>\n<p>Because ECSPR does not allow it. \u20ac5 million per project owner per calendar year is a regulatory ceiling on public fundraising in the EU.<\/p>\n<h3>Vad h\u00e4nder om fas 1 inte n\u00e5r 2,2 miljoner euro?<\/h3>\n<p>Medlen finns hos en oberoende escrow-agent och frig\u00f6rs endast enligt definierade villkor. Vad som h\u00e4nder med det utf\u00e4stade kapitalet om en fas inte slutf\u00f6rs styrs av dessa escrow-villkor, som anges i fasdokumentationen.<\/p>\n<h3>\u00c4r de 1,1 miljoner eurona redan investerade?<\/h3>\n<p>Nej. Det \u00e4r ett icke-bindande intresse som registrerats via v\u00e4ntelistan \u2013 en indikation p\u00e5 efterfr\u00e5gan, inte mottagna medel och inte heller \u00e5taganden. Ingen har betalat n\u00e5gonting.<\/p>\n<h3>Kan jag v\u00e4lja vilken fas jag deltar i?<\/h3>\n<p>I praktiken ja \u2013 genom att v\u00e4lja ditt format. Eget kapital \u00e4r \u00f6ppet fr\u00e5n och med fas 1. L\u00e5net \u00f6ppnar i fas 2, upp till sitt l\u00e5netak.<\/p>\n<h3>Kommer fas 3 att \u00e4ndra min nuvarande position?<\/h3>\n<p>Om BESS finansieras p\u00e5 f\u00f6retagsniv\u00e5 via en bank sp\u00e4ds inte befintliga investerarpositioner ut. Om det forts\u00e4tter p\u00e5 ett annat s\u00e4tt kommer villkoren att fastst\u00e4llas vid den tidpunkten. Ingenting om fas 3 \u00e4r \u00e4nnu avgjort.<\/p>\n<h3>Vad \u00e4r siffran p\u00e5 5 miljoner euro p\u00e5 hemsidan?<\/h3>\n<p>Det \u00e4r b\u00e5da. 5 miljoner euro \u00e4r projektets delm\u00e5l senast den 1 januari 2027, och det \u00e4r ocks\u00e5 det maximala beloppet en projekt\u00e4gare f\u00e5r samla in fr\u00e5n allm\u00e4nheten under ett kalender\u00e5r enligt ECSPR. M\u00e5let \u00e4r avsiktligt satt till taket \u2013 det finns ingen anledning att sikta \u00f6ver en gr\u00e4ns som man inte f\u00e5r \u00f6verskrida.<\/p>\n<hr>\n<p><em>Denna sida beskriver en plan och ett regelverk. Fasm\u00e5l, tidsplan och tillg\u00e4nglighet kan komma att \u00e4ndras. Siffrorna \u00e4r illustrativa och h\u00e4mtade fr\u00e5n projektets finansiella modell; de \u00e4r inte l\u00f6ften och kan komma att f\u00f6rverkligas. Ingenting h\u00e4r \u00e4r ett erbjudande om v\u00e4rdepapper, en uppmaning eller investeringsr\u00e5dgivning. Deltagande sker endast via till\u00e4mplig auktoriserad plattform eller avtal.<\/em><\/p>\n<\/div>\n<div class=\"spg-srodni\">\n<h2>Relaterad l\u00e4sning<\/h2>\n<ul>\n<li><a href=\"https:\/\/solarplusgarden.com\/sv\/hur-investeringar-i-solenergi-fungerar\/\">S\u00e5 fungerar investeringar i solenergi p\u00e5 Solar Plus Garden<\/a><\/li>\n<li><a href=\"https:\/\/solarplusgarden.com\/sv\/solar-construction-management\/\">Effektiv hantering av solcellskonstruktioner: S\u00e4kerst\u00e4llande av framg\u00e5ng f\u00f6r solcellsprojekt p\u00e5 10 MW och mer<\/a><\/li>\n<li><a href=\"https:\/\/solarplusgarden.com\/sv\/hur-tradgarden-fungerar\/\">Hur tr\u00e4dg\u00e5rden fungerar<\/a><\/li>\n<\/ul>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Solar Plus Garden raises capital in phases. People sometimes read that as hesitancy \u2014 a project testing the water before committing. It is the opposite. The phasing is imposed by European law, and understanding why explains most of what follows. Why the Project Is Phased at All Under the ECSPR \u2014 the European Crowdfunding Service [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":2689,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_thumbnail_id":["2689"],"_elementor_version":["3.34.1"],"_elementor_pro_version":["3.34.0"],"cmplz_hide_cookiebanner":[""],"_cmplz_scanned_post":["1"],"_wp_page_template":["default"],"_dp_original":["2685"],"rank_math_internal_links_processed":["1"],"_edit_lock":["1776847733:3"],"rank_math_seo_score":["10"],"_edit_last":["3"],"_wpassetcleanup_data":["[]"],"rank_math_focus_keyword":["project phase roadmap"],"rank_math_description":["Phase 1 (\u20ac2.2M), Phase 2 (to \u20ac7.2M) and Phase 3 (BESS): what each phase funds, what opens when, and where the project stands today."],"rank_math_title":["The Project Phase Roadmap | Solar Plus Garden"],"_elementor_page_assets":["a:0:{}"]},"categories":[35],"tags":[],"class_list":["post-2688","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-progress"],"acf":[],"_links":{"self":[{"href":"https:\/\/solarplusgarden.com\/sv\/wp-json\/wp\/v2\/posts\/2688","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/solarplusgarden.com\/sv\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/solarplusgarden.com\/sv\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/solarplusgarden.com\/sv\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/solarplusgarden.com\/sv\/wp-json\/wp\/v2\/comments?post=2688"}],"version-history":[{"count":0,"href":"https:\/\/solarplusgarden.com\/sv\/wp-json\/wp\/v2\/posts\/2688\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/solarplusgarden.com\/sv\/wp-json\/wp\/v2\/media\/2689"}],"wp:attachment":[{"href":"https:\/\/solarplusgarden.com\/sv\/wp-json\/wp\/v2\/media?parent=2688"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/solarplusgarden.com\/sv\/wp-json\/wp\/v2\/categories?post=2688"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/solarplusgarden.com\/sv\/wp-json\/wp\/v2\/tags?post=2688"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}