{"id":6061,"date":"2026-11-11T17:30:36","date_gmt":"2026-11-11T16:30:36","guid":{"rendered":"https:\/\/solarplusgarden.com\/slovenia-solar-energy-policy\/"},"modified":"2026-11-11T18:00:51","modified_gmt":"2026-11-11T17:00:51","slug":"slovenia-solar-energy-policy","status":"publish","type":"post","link":"https:\/\/solarplusgarden.com\/sr-cir\/slovenia-solar-energy-policy\/","title":{"rendered":"Slovenia Solar Energy Policy: What Changes for Your Project"},"content":{"rendered":"<h1>Slovenia Solar Energy Policy: What Changes for Your Project<\/h1>\n<p>The Slovenia Solar Energy Policy is not one rulebook. It is at least three, administered by three different bodies, and a project can satisfy one and fail the next. A site can be technically connectable and still ineligible for support. A power plant can hold a valid support decision and still lose revenue to grid curtailment. This article separates those layers, shows where projects actually stall, and gives you a sequenced route from parcel to first payment \u2014 with every electricity price, tariff and support window flagged as subject to change.<\/p>\n<h2>What the Slovenia Solar Energy Policy Actually Governs<\/h2>\n<p>Read the framework in three layers, and read them separately before you spend money.<\/p>\n<ul>\n<li><strong>Legislation and national planning<\/strong> \u2014 set by the Ministry for infrastructure and energy. This defines the legal frame for renewable energy sources, the support mechanism, and the headline targets in Slovenia&#8217;s National Energy and Climate Plan (NECP).<\/li>\n<li><strong>Support scheme operation<\/strong> \u2014 run through Borzen, the national electricity market operator. Borzen maintains the register of supported producers and administers payments under the scheme.<\/li>\n<li><strong>Grid access and tariffs<\/strong> \u2014 regulated by the Energy Agency (Agencija za energijo), which sets network charges and oversees the connection regime that distribution operators apply.<\/li>\n<\/ul>\n<p>The NECP sets the 2030 headline target for renewable energy sources, and solar power is the largest single expected contributor. The specific capacity and share figures in the plan are time-sensitive: the plan is revised periodically, and the version in force in 2026-2027 should be checked directly rather than taken from any secondary summary, including this one.<\/p>\n<p>The trap most first-time developers fall into is treating support eligibility as an open, ongoing entitlement. It is not. Support is granted through defined procedures, auction rounds or periods, each with its own conditions and price. &#8220;Eligible under the scheme&#8221; and &#8220;able to connect&#8221; are two different questions with two different answers, decided by two different institutions. Pass one and fail the other, and you have a grid connection with no revenue model.<\/p>\n<p>A third layer sits under all of this and decides whether a site exists at all: building permits and, for ground-mounted projects, spatial planning. A photovoltaic plant is construction work, and the permit is what converts a design into an asset. Do not let support and connection work pull you past the permit gate, because a support decision attached to an unpermittable parcel has no value.<\/p>\n<p>Everything below that touches tariffs, support windows, caps or price references is subject to change and must be verified against current Borzen and Energy Agency publications before it enters a financial model.<\/p>\n<h2>Feed-In Support vs Self-Supply: Two Income Lines, One Grid Connection<\/h2>\n<p>A solar power plant in Slovenia can earn money in two structurally different ways, and the choice is largely made at the metering cabinet and in the Borzen register.<\/p>\n<p><strong>The support route.<\/strong> The plant is entered into the Borzen register and, for a defined period, receives either a guaranteed purchase price for delivered electricity or an operating premium paid on top of market revenue. Payment is made on metered production. The revenue line is a reference price, set administratively, and its great advantage is bankability: a lender can model it.<\/p>\n<p><strong>The self-supply and market route.<\/strong> Generation is offset against a site&#8217;s own consumption, with surplus exported and sold. Revenue depends on the avoided retail price for self-consumed kilowatt-hours and the hourly wholesale price for exported ones. No administrative price reference applies.<\/p>\n<p>The mechanism that bites here is the capture price. As photovoltaic capacity grows in Slovenia, midday generation pushes the wholesale electricity price down in exactly the hours a south-facing plant produces most. A merchant plant earning market revenue therefore depends on tilt, orientation, and increasingly on battery storage to shift production into higher-price hours. Two plants with identical capacity and identical annual yield can have materially different revenue if one exports everything at midday and the other self-consumes or stores.<\/p>\n<p>A second revenue-market detail matters for merchant projects: the balancing and imbalance regime. Generation that deviates from its nominated schedule is settled at imbalance prices set by the transmission system operator, so a plant without a forecasting arrangement or a balancing responsible party carries a cost that never appears in a yield table. Confirm who holds the balancing responsibility, and at what fee, before you model merchant revenue.<\/p>\n<p>What decides which model applies, in practice:<\/p>\n<ul>\n<li><strong>Metering configuration<\/strong> \u2014 a single bidirectional meter supports netting of production against consumption; separate production and consumption metering produces two distinct flows priced differently.<\/li>\n<li><strong>The connection agreement<\/strong> with the relevant distribution operator, which states what the installation is permitted to do and at what capacity.<\/li>\n<li><strong>Prosumer status<\/strong> \u2014 the rules for a household or business that consumes most of what it produces differ from those for a plant built to sell, including how surplus export is valued.<\/li>\n<\/ul>\n<p>One constraint is absolute: a project cannot normally claim support and full self-supply on the same kilowatt-hour. Double counting is the first item an auditor or the scheme operator checks, and it is the fastest route to clawback.<\/p>\n<h2>Grid Connection in Slovenia: Where Applications Actually Stall<\/h2>\n<p>The connection process runs in four steps against named actors, and every step can be refused or conditioned:<\/p>\n<ol>\n<li><strong>Preliminary connection opinion<\/strong> from the distribution system operator \u2014 SODO for the transmission network and the five regional distribution operators for distribution-level connections.<\/li>\n<li><strong>Formal connection consent<\/strong>, issued on the basis of that opinion.<\/li>\n<li><strong>Connection contract<\/strong>, which fixes capacity, cost allocation and conditions.<\/li>\n<li><strong>Physical connection<\/strong> and energisation.<\/li>\n<\/ol>\n<p>The binding constraint is almost never the size of the roof or the field. It is available capacity at the nearest transformer station and on the surrounding medium-voltage network. A 1 MW project on a perfectly oriented parcel with a weak local network is a worse project than a 600 kW plant with spare capacity next door.<\/p>\n<p>Cost allocation is the single largest line that moves a project from viable to dead. Where the applicant pays for grid reinforcement rather than the operator absorbing it, the charge can scale with the works required \u2014 new transformer capacity, line upgrades, protection settings \u2014 and it is not capped by the size of your plant. A reinforcement charge can exceed the value of the generation asset it serves.<\/p>\n<p>Curtailment is the second exposure. Slovenian distribution operators can instruct reductions in output for network reasons. Support schemes typically pay on metered production, so curtailed electricity that never reaches the meter is not paid. Your production assumption must therefore be net of expected curtailment, and the connection contract should be read for the operator&#8217;s right to instruct reductions and any compensation terms.<\/p>\n<p>The decision criterion is blunt: if a connection opinion carries a reinforcement cost without a defined cap, treat the project as unbankable until that number is fixed in writing. An estimate is not a number for this purpose.<\/p>\n<h2>Agrivoltaics and Land Use Under Slovenian Rules<\/h2>\n<p>Slovenia&#8217;s agricultural land regime is the constraint that surprises ground-mounted developers. A solar power plant on farmland generally runs into agricultural land classification and the change-of-use procedure: the land&#8217;s category determines whether reclassification is required, that procedure takes time, and it can be refused.<\/p>\n<p>The agrivoltaic route is the alternative. The same parcel supports both photovoltaic production and farming, with the agricultural activity remaining primary. That is a design constraint, not a slogan. The plant layout has to be built around farm machinery:<\/p>\n<ul>\n<li><strong>Elevated mounting<\/strong>, with the array height set by the clearance the machinery working beneath it needs.<\/li>\n<li><strong>Row spacing<\/strong> wide enough for passes, turns and implement width \u2014 which reduces the module density per hectare compared with a conventional layout.<\/li>\n<li><strong>Electrical infrastructure routed<\/strong> so it does not sever fields into unworkable fragments.<\/li>\n<\/ul>\n<p>Land fragmentation is often the harder problem. Slovenian farmland is dominated by small plots, so assembling a 1 MW-plus ground-mounted site can require agreements with multiple landowners, each a separate negotiation with its own timeline. That is a tenure problem before it is a permitting problem, and it should be resolved before design spend. Keep the lease terms aligned to the asset life and the support period, because a lease that expires before the plant does creates a renegotiation at the worst possible moment.<\/p>\n<p>Agrivoltaics also changes the O&amp;M line, not just the capex. Elevated trackers and wider spans mean more steel per kilowatt and access for agricultural machinery alongside maintenance crews; both belong in the operating-cost assumption, not in a footnote.<\/p>\n<p>A community or garden component layered on a solar site adds a further requirement: it needs its own legal vehicle and its own land tenure, kept separate from the plant company. Solar Plus Garden applies exactly this principle to its own operations \u2014 the Serbian plant company that owns and operates the generation asset is a separate legal entity from the Garden structure, which holds the right to use the Garden concept and content under its own arrangements. The separation exists so that a change in one structure does not automatically destabilise the other.<\/p>\n<h2>Worked Example: Revenue Sketch for a 1 MW Plant in Slovenia<\/h2>\n<p>Everything in this section is an illustration with stated assumptions. No figure is a forecast, a market claim, or a guarantee. Replace each assumption with site-specific data before use.<\/p>\n<p><strong>Assumptions:<\/strong><\/p>\n<ul>\n<li>Installed capacity: 1 MWp.<\/li>\n<li>Specific yield: 1,050\u20131,150 kWh per kWp per year for a well-oriented plant in continental Slovenia (assumption, to be replaced by site irradiance data).<\/li>\n<li>Degradation: 0.5% per year.<\/li>\n<li>Support period: drawn as a fixed number of years for illustration only \u2014 the actual period and price are set by the scheme in force.<\/li>\n<li>O&amp;M: a percentage of capex per year, varying by contract structure.<\/li>\n<\/ul>\n<p><strong>Case A \u2014 support scheme.<\/strong> Revenue = metered production \u00d7 fixed reference price, for the support period only. After expiry, the plant drops to market revenue. That drop is the revenue cliff.<\/p>\n<p><strong>Case B \u2014 self-supply and market.<\/strong> Revenue = avoided retail price for self-consumed kilowatt-hours + wholesale price for exported kilowatt-hours. The swing factors are the self-consumption share and the midday wholesale price.<\/p>\n<table>\n<thead>\n<tr>\n<th>Point in plant life<\/th>\n<th>Production vs year 1<\/th>\n<th>Case A revenue basis<\/th>\n<th>Case B revenue basis<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>1. \u0433\u043e\u0434\u0438\u043d\u0430<\/td>\n<td>100%<\/td>\n<td>Metered production \u00d7 reference price<\/td>\n<td>Self-consumed \u00d7 retail + exported \u00d7 wholesale<\/td>\n<\/tr>\n<tr>\n<td>Year 10<\/td>\n<td>\u224895% (0.5%\/yr degradation)<\/td>\n<td>Same reference price, lower volume<\/td>\n<td>Market prices at that time; self-consumption share as configured<\/td>\n<\/tr>\n<tr>\n<td>Year of support expiry<\/td>\n<td>Per degradation curve<\/td>\n<td>Last year at reference price<\/td>\n<td>Unchanged \u2014 no cliff<\/td>\n<\/tr>\n<tr>\n<td>One year after expiry<\/td>\n<td>Per degradation curve<\/td>\n<td>Falls to market revenue \u2014 the cliff<\/td>\n<td>Unchanged<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><strong>Cost side, same table logic.<\/strong> Enter your own: capex per kWp, grid reinforcement charge from the connection opinion, connection fee, and annual O&amp;M as a percentage of capex. A plant with a large reinforcement charge and a short support period can show a negative return even with strong yield; the same plant with the reinforcement absorbed by the operator can clear its hurdle rate.<\/p>\n<p>The point of presenting it this way rather than as a single payback number is that the payback figure hides the cliff. A 7-year payback on a plant with a 15-year support period and a 25-year asset life tells you almost nothing about years 16 to 25, which is where merchant revenue risk lives.<\/p>\n<h2>Which Policy Track Fits Your Project Size<\/h2>\n<p>Three reader profiles, three different legal routes. The variables that decide which track is open to you are own-consumption share, connection voltage level, and whether the site is a building or agricultural land.<\/p>\n<table>\n<thead>\n<tr>\n<th>Profile<\/th>\n<th>Route theoretically available<\/th>\n<th>Deciding authority<\/th>\n<th>Principal risk exposure<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Household or small business<\/td>\n<td>Self-supply, rooftop photovoltaic, net metering or net billing<\/td>\n<td>Distribution operator; Energy Agency for tariff rules<\/td>\n<td>Retail price policy and netting rules changing under you<\/td>\n<\/tr>\n<tr>\n<td>Mid-size investor<\/td>\n<td>Support scheme entry, or a corporate power purchase agreement<\/td>\n<td>Borzen for support; counterparty for a PPA<\/td>\n<td>Scheme conditions; counterparty credit; capture price<\/td>\n<\/tr>\n<tr>\n<td>Utility-scale developer<\/td>\n<td>Auction-based support or merchant market revenue<\/td>\n<td>Ministry (scheme design), Borzen (register), operator (capacity)<\/td>\n<td>Auction design, curtailment, reinforcement cost<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>For the community and membership model, the comparable element is the structure, not any yield: a membership fee is invested into solar, and community activities and costs are funded and managed from solar revenue. Access to the community is not conditional on making a direct solar investment \u2014 the membership fee is what is invested. That structure sits in its own legal vehicle, which is why it can survive a change in a single plant&#8217;s support status. What it does not carry is any promised return, and no track in this table does.<\/p>\n<p>A note on the fuel comparison, because it belongs in exactly one place: Slovenia&#8217;s electricity mix includes nuclear and hydro generation, which sets a relatively low and stable baseline wholesale price. A market-revenue photovoltaic plant competes against that baseline in the hours it exports. Imported fuel prices matter far less to Slovenian wholesale electricity than the domestic generation mix does. Natural gas still sets the price at the margin on many European days, but for a Slovenian solar asset the hours that matter are the solar hours, and those are driven by installed photovoltaic capacity, not by fuel. That is the fuel context a developer needs \u2014 it is not a substitute for reading the support rules.<\/p>\n<h2>How to Sequence a Slovenian PV Project: From Parcel to Payment<\/h2>\n<p>Eight gates, each with a stop rule at the financial commitment that follows it. Use it as a decision checklist, not a calendar.<\/p>\n<ol>\n<li><strong>Land or roof tenure secured.<\/strong> Signed lease or ownership, all parcels, all landowners, term aligned to asset life. Stop if any parcel is unresolved.<\/li>\n<li><strong>Preliminary grid opinion obtained.<\/strong> Request this before spending on design. Stop if the opinion is refused or conditioned on undefined works.<\/li>\n<li><strong>Grid connection cost fixed in writing.<\/strong> Stop if the reinforcement charge is uncapped or estimated.<\/li>\n<li><strong>Support scheme eligibility confirmed.<\/strong> Confirm before signing a construction contract. Stop if the current round is closed to your project type and merchant revenue does not clear your hurdle rate.<\/li>\n<li><strong>Building or spatial permit issued<\/strong>, including any change-of-use decision for agricultural land.<\/li>\n<li><strong>Connection contract signed<\/strong>, with curtailment rights and cost allocation stated.<\/li>\n<li><strong>Construction and commissioning<\/strong>, with metering installed in the configuration that matches your chosen revenue model, and a balancing arrangement in place if you sell to market.<\/li>\n<li><strong>Register entry and first payment.<\/strong> No support revenue until the register entry is effective.<\/li>\n<\/ol>\n<p>The sequence is not fully linear \u2014 gates 2 and 4 should run in parallel with early design work, and both should precede any construction commitment. The Solar Plus Garden red line applies unchanged: no structure you do not fully understand, and no commitment before legal clarity. In project terms, no fixed connection cost, no support confirmation, no project.<\/p>\n<h2>What Would Change This Advice<\/h2>\n<p>Four levers would reorder the decision, each with an observable signal:<\/p>\n<ul>\n<li><strong>A new support round with a published price cap.<\/strong> Watch Borzen register announcements. Trigger: a new round opening changes the Case A\/Case B comparison for every project in the pipeline.<\/li>\n<li><strong>A change to net metering or net billing for self-supply.<\/strong> Watch Energy Agency tariff decisions. Trigger: any revision to how self-consumed and exported electricity are valued changes rooftop economics directly.<\/li>\n<li><strong>A revision of grid reinforcement cost allocation.<\/strong> Watch ministry consultations and Energy Agency decisions. Trigger: shifting reinforcement cost from applicant to operator converts marginal projects into viable ones, and vice versa.<\/li>\n<li><strong>A change to agricultural land rules for agrivoltaics.<\/strong> Watch ministry consultations on spatial planning and the NECP revision. Trigger: clearer dual-use definitions widen the available land pool.<\/li>\n<\/ul>\n<p>Slovenia&#8217;s NECP and support framework are under periodic revision toward 2030. Any figure quoted in an older article \u2014 including this one \u2014 should be re-verified before use in a business plan.<\/p>\n<p>Note what does not change with support policy: a community or membership funding route that is legally separate from any single plant does not depend on that plant&#8217;s support status. If the policy environment tightens support for merchant plants while keeping self-supply attractive, the separate structure is what allows the wider project to keep functioning while the generation asset adapts.<\/p>\n<h2>\u0427\u0435\u0441\u0442\u043e \u043f\u043e\u0441\u0442\u0430\u0432\u0459\u0430\u043d\u0430 \u043f\u0438\u0442\u0430\u045a\u0430<\/h2>\n<h3>Can I still get feed-in support for a new solar power plant in Slovenia?<\/h3>\n<p>Not by default. Support is granted through defined procedures run by Borzen, not as an open ongoing entitlement, and each round has its own eligibility and price conditions. Whether support is open to a new project in 2026-2027 depends on the current round and the statute in force \u2014 check Borzen&#8217;s register announcements and the ministry&#8217;s current rules before you base a business plan on it.<\/p>\n<h3>How long does a grid connection take for a 1 MW plant in Slovenia?<\/h3>\n<p>There is no single published figure. The timeline is governed by the distribution operator&#8217;s preliminary opinion, the formal connection consent, and any required network reinforcement at the nearest transformer station. The variable that moves the date most is whether the local network has spare capacity; if reinforcement is needed, the schedule is set by works that the operator, not the investor, controls. Treat any timeline quote without a written connection opinion as guesswork.<\/p>\n<h3>Does the support scheme pay for electricity that the grid operator curtails?<\/h3>\n<p>As a rule, support is paid on metered production, so curtailed electricity that never reaches the meter is not paid. That means your revenue assumption should be net of expected curtailment, and your connection contract should be read for the operator&#8217;s right to instruct reductions. Confirm the specific treatment in the current support rules, because the detail is set in the scheme documentation, not in general law.<\/p>\n<h3>Can I put a solar power plant on agricultural land in Slovenia?<\/h3>\n<p>It depends on the land classification and the spatial planning procedure. Agricultural land generally requires a change-of-use route, while an agrivoltaic layout can in some cases keep the agricultural activity primary \u2014 provided the mounting and row spacing leave the land farmable. The practical blocker is often land fragmentation: a viable site may need several parcels and several landowners to agree, which is a tenure problem before it is a permitting problem.<\/p>\n<h3>What decides whether I earn a support price or a market price?<\/h3>\n<p>Two switch points: your metering configuration and your entry in the Borzen support register. A single bidirectional meter with netting supports self-supply economics; separate production and consumption metering produces two priced flows. Register entry is what creates the administrative price reference. You cannot normally claim both on the same kilowatt-hour.<\/p>\n<div class=\"spg-srodni\">\n<h2>\u041f\u043e\u0432\u0435\u0437\u0430\u043d\u043e \u0447\u0438\u0442\u0430\u045a\u0435<\/h2>\n<ul>\n<li><a href=\"https:\/\/solarplusgarden.com\/sr-cir\/solar-project-management\/\">\u0421\u0430\u0432\u043b\u0430\u0434\u0430\u0432\u0430\u045a\u0435 \u0443\u043f\u0440\u0430\u0432\u0459\u0430\u045a\u0430 \u0441\u043e\u043b\u0430\u0440\u043d\u0438\u043c \u043f\u0440\u043e\u0458\u0435\u043a\u0442\u0438\u043c\u0430: \u0415\u0444\u0438\u043a\u0430\u0441\u043d\u0435 \u0441\u0442\u0440\u0430\u0442\u0435\u0433\u0438\u0458\u0435 \u0437\u0430 \u0440\u0430\u0437\u0432\u043e\u0458 \u0441\u043e\u043b\u0430\u0440\u043d\u0438\u0445 \u0441\u0438\u0441\u0442\u0435\u043c\u0430 \u043a\u043e\u043c\u0443\u043d\u0430\u043b\u043d\u0438\u0445 \u0443\u0441\u043b\u0443\u0433\u0430<\/a><\/li>\n<li><a href=\"https:\/\/solarplusgarden.com\/sr-cir\/solar-financial-modeling\/\">\u041a\u0430\u043a\u043e \u0438\u0437\u0433\u0440\u0430\u0434\u0438\u0442\u0438 \u0438 \u043a\u043e\u0440\u0438\u0441\u0442\u0438\u0442\u0438 \u0444\u0438\u043d\u0430\u043d\u0441\u0438\u0458\u0441\u043a\u0438 \u043c\u043e\u0434\u0435\u043b \u0441\u043e\u043b\u0430\u0440\u043d\u0435 \u0435\u043d\u0435\u0440\u0433\u0438\u0458\u0435 \u0437\u0430 \u0435\u0444\u0438\u043a\u0430\u0441\u043d\u0435 \u043e\u0434\u043b\u0443\u043a\u0435 \u043e \u0444\u0438\u043d\u0430\u043d\u0441\u0438\u0440\u0430\u045a\u0443 \u043f\u0440\u043e\u0458\u0435\u043a\u0442\u0430<\/a><\/li>\n<li><a href=\"https:\/\/solarplusgarden.com\/sr-cir\/solar-best-practices\/\">Solar Best Practices for Successful Project Design, Operations, and Maintenance<\/a><\/li>\n<\/ul>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>The Slovenia Solar Energy Policy is not one rulebook. It is at least three, administered by three different bodies, and a project can satisfy one and fail\u2026<\/p>","protected":false},"author":9,"featured_media":6060,"comment_status":"closed","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"rank_math_internal_links_processed":["1"],"_thumbnail_id":["6060"],"rank_math_canonical_url":["https:\/\/solarplusgarden.com\/slovenia-solar-energy-policy\/"],"rank_math_title":["Slovenia Solar Energy Policy: What Changes for Your Project"],"rank_math_description":["The Slovenia Solar Energy Policy is not one rulebook. It is at least three, administered by three different bodies, and a project can satisfy one and fail\u2026"],"rank_math_focus_keyword":["Slovenia Solar Energy Policy"],"rank_math_primary_category":["26"],"_cmplz_scanned_post":["1"],"_elementor_page_assets":["a:0:{}"]},"categories":[26],"tags":[],"class_list":["post-6061","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regional-and-local-content"],"acf":[],"_links":{"self":[{"href":"https:\/\/solarplusgarden.com\/sr-cir\/wp-json\/wp\/v2\/posts\/6061","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/solarplusgarden.com\/sr-cir\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/solarplusgarden.com\/sr-cir\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/solarplusgarden.com\/sr-cir\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/solarplusgarden.com\/sr-cir\/wp-json\/wp\/v2\/comments?post=6061"}],"version-history":[{"count":0,"href":"https:\/\/solarplusgarden.com\/sr-cir\/wp-json\/wp\/v2\/posts\/6061\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/solarplusgarden.com\/sr-cir\/wp-json\/wp\/v2\/media\/6060"}],"wp:attachment":[{"href":"https:\/\/solarplusgarden.com\/sr-cir\/wp-json\/wp\/v2\/media?parent=6061"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/solarplusgarden.com\/sr-cir\/wp-json\/wp\/v2\/categories?post=6061"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/solarplusgarden.com\/sr-cir\/wp-json\/wp\/v2\/tags?post=6061"}],"curies":[{"name":"\u0412\u041f","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}