{"id":6012,"date":"2026-11-05T09:30:36","date_gmt":"2026-11-05T08:30:36","guid":{"rendered":"https:\/\/solarplusgarden.com\/czech-solar-energy-development\/"},"modified":"2026-11-05T09:30:36","modified_gmt":"2026-11-05T08:30:36","slug":"czech-solar-energy-development","status":"publish","type":"post","link":"https:\/\/solarplusgarden.com\/es\/czech-solar-energy-development\/","title":{"rendered":"Czech Solar Energy Development: What Builders Need to Know"},"content":{"rendered":"<h1>Czech Solar Energy Development: What Builders Need to Know<\/h1>\n<p>Czech Solar Energy Development looks very different in 2026 than it did during the first solar boom. The country that once paid some of Europe&#8217;s highest feed-in tariffs now runs an auction-based support system, and the practical work of building a solar farm has shifted from chasing subsidies to securing grid capacity, land permissions, and a defensible revenue model. This article is written for the people who have to make those calls: landowners with a hectare to spare, developers assembling a portfolio, contractors pricing an EPC contract, and investors comparing the Czech Republic with Poland, Slovakia, and Germany.<\/p>\n<p>Everything time-sensitive below \u2014 auction volumes, tariff levels, grid rules, land thresholds \u2014 should be verified against the Energy Regulatory Office (ER\u00da) and the Ministry of Industry and Trade before you commit capital. Regulation in this market moves faster than most pro-forma models.<\/p>\n<h2>Czech Solar Energy Development After the 2021 Auction Reset<\/h2>\n<p>The Czech Republic&#8217;s solar story began with a feed-in tariff scheme in the 2005\u20132010 period that triggered rapid construction of ground-mounted solar power plants. The support framework is now codified in Act No. 165\/2012 Coll. on supported energy sources, as amended. Since 2021, new capacity above small-scale thresholds has entered the market through auctions rather than open-ended tariffs. Auction schedules and volumes are published by ER\u00da and are subject to change from round to round.<\/p>\n<p>A developer in Czechia now faces a genuine choice between two routes:<\/p>\n<ul>\n<li><strong>Merchant and PPA projects.<\/strong> The plant sells electricity to the grid at spot prices or to a corporate offtaker under a power purchase agreement. No operational aid is involved, which means no state aid approval process \u2014 but also no revenue floor.<\/li>\n<li><strong>Auction-supported projects.<\/strong> The plant competes for operational support, receiving either a feed-in tariff or a feed-in premium for the contract term. This requires pre-qualification, a winning bid, and state aid clearance.<\/li>\n<\/ul>\n<p>National targets sit in the National Energy and Climate Plan and the State Energy Policy, but specific capacity figures are revised periodically. Treat any number you have seen quoted as indicative and check the latest Ministry of Industry and Trade update. The framework sets direction; the auction calendar sets what you can actually build.<\/p>\n<p>The practical consequence for a developer is that the support scheme is no longer the first question. Grid capacity and permitting sequence the project before revenue does. A site that clears both can chase a bid or a PPA; a site that clears neither cannot be rescued by a favourable auction round.<\/p>\n<h2>How the Czech Auction Mechanism Sets Project Revenue<\/h2>\n<p>The auction is the single most important revenue lever for a supported project. The sequence runs roughly as follows:<\/p>\n<ol>\n<li><strong>Pre-qualification.<\/strong> The project must demonstrate land rights, a grid connection position, and permitting progress before it can bid. Weak pre-qualification is the most common reason projects never reach the bidding stage.<\/li>\n<li><strong>Bid submission.<\/strong> Developers bid a price per MWh. Bids are ranked and accepted until the round&#8217;s budget is exhausted.<\/li>\n<li><strong>Clearing price and award.<\/strong> Winning bids receive a 20-year operational support contract, subject to state aid approval by the European Commission framework in force at the time.<\/li>\n<\/ol>\n<p>Two support forms are available. The <strong>feed-in tariff<\/strong> pays a fixed price per MWh generated, giving the developer certainty and removing market exposure. The <strong>feed-in premium<\/strong> pays a bonus on top of the market reference price, so the plant sells its electricity and receives the difference. The premium exposes the developer to wholesale price movements and is indexed according to rules set in the auction parameters \u2014 indexation mechanics should be read line by line in the ER\u00da auction documentation for the specific round.<\/p>\n<p>The Energy Regulatory Office sets auction parameters; the Ministry of Industry and Trade approves the overall framework. Budgets and caps are announced annually. A round can be smaller than developers expect, and a single budget cut can strand a fully permitted project. Do not assume the next round will look like the last one.<\/p>\n<p>A last design detail that catches first-time bidders: the two support forms do not carry the same bankability. A feed-in tariff is easier to finance because the revenue line is fixed for the contract term, while a feed-in premium leaves the merchant leg exposed and lenders will size debt against the weaker of the two. If you intend to raise project debt, model both forms side by side before you fix a bid price.<\/p>\n<h2>Czechia&#8217;s Solar GIS and Land Classification for PV Siting<\/h2>\n<p>The Czech solar resource is moderate by European standards. Global horizontal irradiation typically falls in the range of 1,000\u20131,200 kWh\/m\u00b2 per year, with South Moravia and parts of the Bohemian basin among the stronger locations. Prague and the surrounding Central Bohemian region sit mid-range. That number drives everything downstream: yield per kWp, revenue per hectare, and the land lease you can afford to pay.<\/p>\n<p>Land classification is where many PV projects stall. Agricultural land is protected under Act No. 334\/1992 Coll. on agricultural land protection, which restricts conversion of high-grade farmland to non-agricultural use. In practice, developers gravitate toward:<\/p>\n<ul>\n<li><strong>Lower-grade land classes<\/strong>, where conversion approval is more achievable.<\/li>\n<li><strong>Brownfields and former industrial sites<\/strong>, which avoid the agricultural land question entirely but often carry contamination liability and weaker grid access.<\/li>\n<li><strong>Land already zoned for development<\/strong> in the regional spatial plan.<\/li>\n<\/ul>\n<p>The building authority and the regional spatial plan determine whether a ground-mounted solar farm is permissible on a given parcel. Land-class thresholds and exemptions change, so confirm the current rules with the local building office before signing a lease option. A cheap parcel that cannot be permitted is not cheap.<\/p>\n<p>The solar GIS work should come before the land hunt, not after. Pull the irradiation layer for a candidate parcel first, then check the land class, then check the grid. A parcel that fails any one of the three is not a project, and the earlier you find out, the less you spend on studies, legal opinions, and option fees.<\/p>\n<h2>Permitting a Czech Solar Power Plant: From Z\u00e1vazn\u00e9 Stanovisko to Grid Connection<\/h2>\n<p>Permitting a solar power plant in the Czech Republic follows a sequence, and the order matters because each step depends on the previous one. The outline below is a working map, not legal advice.<\/p>\n<ol>\n<li><strong>Binding opinion from the building authority (z\u00e1vazn\u00e9 stanovisko).<\/strong> This establishes whether the intended use is acceptable on the site and is typically the first formal gate.<\/li>\n<li><strong>Environmental impact assessment (EIA)<\/strong> where required under Act No. 100\/2001 Coll. Not every solar project triggers EIA, but size, location, and proximity to protected areas determine whether it applies.<\/li>\n<li><strong>Grid connection agreement with the distribution system operator.<\/strong> Apply to the relevant DSO \u2014 \u010cEZ Distribuce, EG.D, or PREdistribuce depending on territory \u2014 for a capacity assessment, then negotiate the connection agreement.<\/li>\n<li><strong>Building permit or notification.<\/strong> Projects above a certain size require a building permit rather than a simple notification. The Building Act (Act No. 183\/2006 Coll.) is being replaced by new legislation, so verify which procedural rules currently apply to your project type.<\/li>\n<\/ol>\n<p>Separately, the Energy Regulatory Office licenses electricity generation. The licence is not the same as the building permit or the grid connection, and a project needs all three before it can generate and sell. Build the permitting timeline into your financial model from day one; permitting delays are the most common cause of budget overruns on Czech solar projects.<\/p>\n<p>Practical sequencing advice from projects that have run this path: open the grid capacity assessment in parallel with the z\u00e1vazn\u00e9 stanovisko, not after it. The building authority and the DSO answer to different rules and different queues, and running them in series adds months to the schedule for no reason. The only step that must wait is the connection agreement itself, which needs the capacity assessment in hand.<\/p>\n<h2>What a Czech Solar Farm Earns: Auction Prices, PPAs, and Merchant Risk<\/h2>\n<p>Revenue comes from one of three sources: auction-awarded support, a corporate PPA, or merchant sales at spot prices. Each carries a different risk profile, and the spread between them is the core commercial decision on any project.<\/p>\n<p>The worked example below is an <strong>illustration only<\/strong>. It uses stated assumptions and is not a market forecast, a yield guarantee, or an offer. Auction clearing prices, PPA prices, and spot averages vary by round and by contract and must be verified for your project.<\/p>\n<table>\n<thead>\n<tr>\n<th>Revenue route<\/th>\n<th>Assumed price (EUR\/MWh)<\/th>\n<th>Annual output (MWh)<\/th>\n<th>Gross revenue (EUR\/year)<\/th>\n<th>Risk note<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Auction feed-in tariff<\/td>\n<td>60\u201380<\/td>\n<td>1,000<\/td>\n<td>60,000\u201380,000<\/td>\n<td>Fixed, subject to winning a round and state aid approval<\/td>\n<\/tr>\n<tr>\n<td>Corporate PPA<\/td>\n<td>70\u201390<\/td>\n<td>1,000<\/td>\n<td>70,000\u201390,000<\/td>\n<td>Counterparty credit risk; contract term and indexation matter<\/td>\n<\/tr>\n<tr>\n<td>Merchant \/ spot<\/td>\n<td>50\u201370<\/td>\n<td>1,000<\/td>\n<td>50,000\u201370,000<\/td>\n<td>Full price exposure; cannibalisation risk at midday<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Assumptions: 1 MW plant, 1,000 MWh\/MW\/year yield, prices illustrative and not forecasts. Before costs, gross revenue lands in the 50,000\u201390,000 EUR\/year range across the three routes. Operating costs \u2014 O&#038;M contracts, insurance, grid fees, monitoring, and land lease \u2014 reduce net revenue materially. A project that looks viable on gross revenue can fail on net; model the costs before you bid.<\/p>\n<p>To make the comparison sharper, the table below sketches a per-kW cost breakdown for the same illustrative 1 MW plant. It is built from clearly stated assumptions and is not a supplier quote.<\/p>\n<table>\n<thead>\n<tr>\n<th>Cost line<\/th>\n<th>Assumed cost (EUR\/kW)<\/th>\n<th>Comment<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Modules and inverter<\/td>\n<td>350\u2013500<\/td>\n<td>Depends on module type, tracker choice, and delivery terms<\/td>\n<\/tr>\n<tr>\n<td>Mounting and balance of system<\/td>\n<td>120\u2013200<\/td>\n<td>Fixed-tilt at the low end, trackers and elevated agrivoltaic mounting higher<\/td>\n<\/tr>\n<tr>\n<td>EPC and grid connection<\/td>\n<td>150\u2013250<\/td>\n<td>Grid reinforcement charges can push the upper bound<\/td>\n<\/tr>\n<tr>\n<td>Development and permitting<\/td>\n<td>50\u2013100<\/td>\n<td>Legal opinions, studies, option fees<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Assumptions: 1 MW capacity, illustrative only, all figures subject to change. Read this together with the revenue table. A plant at 700\u20131,050 EUR\/kW total cost and 60,000\u201380,000 EUR\/year of gross revenue has a very different debt capacity under a feed-in tariff than under merchant pricing \u2014 and the operating costs still have to come out of both.<\/p>\n<h2>Grid Capacity and Curtailment Risk in the Czech Republic<\/h2>\n<p>Available grid capacity varies sharply by region and by DSO. \u010cEZ Distribuce, EG.D, and PREdistribuce each manage their own territory, and each may refuse connection outright or offer limited capacity where the local network is constrained. A capacity assessment is not a formality; it is a hard constraint that can kill a site.<\/p>\n<p>Curtailment is the second grid risk. During periods of high solar output and low demand, the DSO may instruct the plant to reduce production. Every curtailed MWh is lost revenue, and compensation rules are set under the Energy Act and ER\u00da decrees and are subject to change. Two mitigations are worth modelling:<\/p>\n<ul>\n<li><strong>Co-located battery storage<\/strong>, which can absorb curtailed output and discharge it at peak prices.<\/li>\n<li><strong>Site selection<\/strong> in regions with stronger network headroom, even at the cost of slightly lower irradiation.<\/li>\n<\/ul>\n<p>Neither fix is free. Storage adds capital cost and degradation risk; better grid regions may carry higher land costs. The trade-off should be quantified in the same model that prices your revenue.<\/p>\n<p>The order of operations on grid is fixed by the DSOs themselves. You request a capacity assessment, you receive a written position on how much capacity the local network can accept and under what conditions, and only then do you sign a connection agreement. Skipping the written position and relying on a verbal indication is the single most common way developers lose a year on a site that was never going to connect.<\/p>\n<h2>Agrivoltaics in Czechia: Dual-Use Rules and Practical Constraints<\/h2>\n<p>Agrivoltaics means combining agriculture and solar PV on the same land, usually with elevated panels or widely spaced rows so that crops and machinery can operate underneath. It is one answer to the land-class problem described above, and it is directly relevant to the community and garden model that Solar Plus Garden is building around a 10 MW direction.<\/p>\n<p>The legal status in Czechia is the constraint. Agrivoltaics is not yet separately defined in Czech legislation, so a dual-use project must argue compatibility with Act No. 334\/1992 Coll. on agricultural land protection rather than relying on a dedicated framework. In practice that means early engagement with the building authority and a legal opinion on whether the agricultural use is genuinely preserved.<\/p>\n<p>Practical constraints are real:<\/p>\n<ul>\n<li><strong>Panel height.<\/strong> Machinery access typically requires clearance of roughly 2.5\u20133 m, which raises mounting costs and wind loading.<\/li>\n<li><strong>Crop selection.<\/strong> Shade-tolerant crops and certain horticultural uses are more compatible than tall cereals.<\/li>\n<li><strong>Shading effects.<\/strong> Yield losses on the agricultural side must be offset by the solar revenue for the dual-use case to hold.<\/li>\n<\/ul>\n<p>There is potential for agrivoltaics to be recognised under future CAP strategic plan measures, but that is subject to change and should not be assumed in a financial model. Build the case on the solar revenue and the agricultural use you can defend today.<\/p>\n<p>The decision criteria for a dual-use project are simple to state and hard to satisfy: the agricultural use must be real, continuous, and documentable, and the solar revenue must cover the elevated mounting premium. If either test fails, the project is a conventional solar farm with a more expensive structure, and it should be permitted and financed as one.<\/p>\n<h2>Czech Solar Panel and Inverter Choices for Local Conditions<\/h2>\n<p>Component selection in Czechia is driven by the moderate irradiation profile and by grid code requirements. For modules, monocrystalline PERC and TOPCon panels are the mainstream choices, and bifacial modules can add yield on reflective ground or elevated agrivoltaic mounting. TOPCon is increasingly the default for new utility-scale solar farms because of its efficiency and temperature behaviour.<\/p>\n<p>Inverter choice is a trade-off between granularity and cost:<\/p>\n<ul>\n<li><strong>String inverters<\/strong> offer per-string monitoring and easier replacement, at a higher component count.<\/li>\n<li><strong>Central inverters<\/strong> reduce component count and cost per MW but concentrate failure risk.<\/li>\n<\/ul>\n<p>Whichever you choose, the inverter must provide reactive power capability and frequency response to meet grid code requirements set by ER\u00da and the DSOs. Those requirements are subject to change, so confirm the current specification with your DSO before finalising the equipment package. Mounting is a further decision: fixed-tilt is cheaper and simpler, while single-axis trackers typically boost yield by 10\u201320% but add cost, maintenance, and moving parts.<\/p>\n<p>On a moderate-irradiation site, the panel and mounting decisions interact. Bifacial modules only pay for themselves where the ground is reflective or the mounting lifts the panel clear of the soil, which is the same condition that raises mounting cost in an agrivoltaic layout. Model the incremental yield against the incremental capex on the specific site rather than adopting a default from a sunnier market.<\/p>\n<h2>Comparing Czech Solar Power Plants with Neighbouring Markets<\/h2>\n<p>Investors comparing the Czech Republic with Slovakia, Poland, and Germany should weigh auction design, grid connection timelines, land costs, and PPA market maturity. The table below is an <strong>illustration<\/strong> with qualitative ratings; specific figures vary by region and round and must be verified.<\/p>\n<table>\n<thead>\n<tr>\n<th>Criterion<\/th>\n<th>Czech Republic<\/th>\n<th>Eslovaquia<\/th>\n<th>Polonia<\/th>\n<th>Alemania<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Auction frequency<\/td>\n<td>Periodic rounds, budget announced annually<\/td>\n<td>Periodic<\/td>\n<td>Regular, larger volumes<\/td>\n<td>Regular, mature<\/td>\n<\/tr>\n<tr>\n<td>Grid connection lead time (indicative)<\/td>\n<td>2\u20134 years<\/td>\n<td>2\u20133 years<\/td>\n<td>2\u20134 years<\/td>\n<td>1\u20133 years<\/td>\n<\/tr>\n<tr>\n<td>Land lease cost<\/td>\n<td>Moderate<\/td>\n<td>Moderate<\/td>\n<td>Variable, rising<\/td>\n<td>Higher<\/td>\n<\/tr>\n<tr>\n<td>PPA market maturity<\/td>\n<td>Developing<\/td>\n<td>Developing<\/td>\n<td>Growing<\/td>\n<td>Mature<\/td>\n<\/tr>\n<tr>\n<td>Regulatory stability<\/td>\n<td>Stable since 2021 reset<\/td>\n<td>Moderate<\/td>\n<td>Has changed repeatedly<\/td>\n<td>Stable<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>The Czech market is smaller than Poland&#8217;s but has offered a more predictable framework since the 2021 reset. Germany remains the deepest PPA market; Slovakia sits between the two in scale. None of these ratings substitute for due diligence on a specific site and a specific round. Investors with capacity should diversify across markets rather than concentrate in one.<\/p>\n<p>The renewable energy comparison that matters most for a single project is the grid queue, not the auction. A market with generous support and a four-year connection wait will strand your capital longer than a market with thinner support and a two-year connection. Weigh both before you allocate.<\/p>\n<h2>What to Do Next: A Decision Checklist for Czech Solar Projects<\/h2>\n<p>If you are moving from interest to action, work through these steps in order. Each one can stop the project, which is the point of sequencing them.<\/p>\n<ol>\n<li><strong>Secure land rights.<\/strong> Confirm land class, zoning, and a lease or purchase option before spending on studies.<\/li>\n<li><strong>Verify grid capacity.<\/strong> Open a capacity assessment with the relevant DSO and get a written position.<\/li>\n<li><strong>Complete permitting.<\/strong> Obtain the z\u00e1vazn\u00e9 stanovisko, confirm EIA applicability, and secure the building permit or notification.<\/li>\n<li><strong>Choose the revenue route.<\/strong> Decide between auction, PPA, and merchant based on your risk tolerance and the current round calendar.<\/li>\n<li><strong>Secure financing.<\/strong> Match debt tenor to the support contract or PPA term, and stress-test for curtailment and price downside.<\/li>\n<li><strong>Model operating costs.<\/strong> O&#038;M, insurance, grid fees, and land lease must be in the model before you bid or sign.<\/li>\n<\/ol>\n<p>Community investment models can aggregate smaller investors across a portfolio. Solar Plus Garden&#8217;s 10 MW direction and its \u20ac500 minimum investment threshold are an example of that aggregation approach \u2014 not a guarantee of returns, and not a substitute for the legal and revenue verification above. Any participation should be based on the current legal and market conditions, which are subject to change.<\/p>\n<p>The short version: start with grid capacity and land permission, because those are the two constraints that cannot be bought around. Everything else \u2014 modules, trackers, inverters, PPA structure \u2014 can be optimised once the site is real.<\/p>\n<h2>Preguntas frecuentes<\/h2>\n<h3>What is the current support scheme for solar power plants in the Czech Republic?<\/h3>\n<p>The Czech Republic supports new solar projects through auctions administered by the Energy Regulatory Office (ER\u00da). Successful bidders can receive either a feed-in tariff or a feed-in premium for 20 years, subject to state aid approval. Auction schedules and budgets are announced annually and are subject to change.<\/p>\n<h3>How long does it take to get a grid connection for a solar farm in Czechia?<\/h3>\n<p>Grid connection timelines vary by region and DSO (\u010cEZ Distribuce, EG.D, PREdistribuce). A feasibility study and capacity assessment can take several months, and the full connection agreement may take 2\u20134 years depending on grid reinforcement needs. These timelines are indicative and subject to change.<\/p>\n<h3>Can I build a solar power plant on agricultural land in the Czech Republic?<\/h3>\n<p>Building on agricultural land is restricted by Act No. 334\/1992 Coll. on agricultural land protection. Projects on lower-grade land or brownfields may be permitted, but a binding opinion from the building authority is required. Agrivoltaics is not yet separately defined, so dual-use projects need careful legal review.<\/p>\n<h3>What is the typical revenue for a 1 MW solar plant in the Czech Republic?<\/h3>\n<p>Revenue depends on the support scheme or PPA price. As an illustration, a 1 MW plant with 1,000 MWh\/MW\/year yield and a price of 60\u201390 EUR\/MWh could generate 60,000\u201390,000 EUR per year before operating costs. These figures are illustrative only and not a forecast or guarantee.<\/p>\n<h3>Where can I find reliable information about solar in Czechia?<\/h3>\n<p>Start with the Energy Regulatory Office for auction parameters and the Ministry of Industry and Trade for the national framework. The DSOs publish grid capacity and connection rules for their territories. For site-level data, the solar GIS layers and the regional spatial plan tell you what a specific parcel can support.<\/p>","protected":false},"excerpt":{"rendered":"<p>Czech Solar Energy Development looks very different in 2026 than it did during the first solar boom.<\/p>","protected":false},"author":9,"featured_media":6011,"comment_status":"","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"rank_math_internal_links_processed":["1"],"_thumbnail_id":["6011"],"rank_math_canonical_url":["https:\/\/solarplusgarden.com\/czech-solar-energy-development\/"],"rank_math_title":["Czech Solar Energy Development: What Builders Need to Know |"],"rank_math_description":["Czech Solar Energy Development looks very different in 2026 than it did during the first solar boom."],"rank_math_focus_keyword":["Czech Solar Energy Development"],"rank_math_primary_category":["26"],"_cmplz_scanned_post":["1"],"_elementor_page_assets":["a:0:{}"]},"categories":[26],"tags":[],"class_list":["post-6012","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regional-and-local-content"],"acf":[],"_links":{"self":[{"href":"https:\/\/solarplusgarden.com\/es\/wp-json\/wp\/v2\/posts\/6012","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/solarplusgarden.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/solarplusgarden.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/solarplusgarden.com\/es\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/solarplusgarden.com\/es\/wp-json\/wp\/v2\/comments?post=6012"}],"version-history":[{"count":0,"href":"https:\/\/solarplusgarden.com\/es\/wp-json\/wp\/v2\/posts\/6012\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/solarplusgarden.com\/es\/wp-json\/wp\/v2\/media\/6011"}],"wp:attachment":[{"href":"https:\/\/solarplusgarden.com\/es\/wp-json\/wp\/v2\/media?parent=6012"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/solarplusgarden.com\/es\/wp-json\/wp\/v2\/categories?post=6012"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/solarplusgarden.com\/es\/wp-json\/wp\/v2\/tags?post=6012"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}